PBOPlus 7-Step Framework
for OEE Improvement & Changeover Time Reduction
Create clear Tool–Time–Task SOPs for machine operations and changeovers
Ensure “Right First Time” execution with preparatory checks
01: Design & Deploy 3T SOPs
Use templates and checklists to monitor adherence and performance
Enable auditability and operator accountability
02: Implement Precision Tracking Tools
Form reliability teams for proactive machine upkeep
Reduce breakdowns through structured maintenance protocols
03: Build Preventive Maintenance Capability
Conduct speed trials and test alternative parts for faster output
Minimize setup/changeover time with process fine-tuning
04: Optimize Machine Speed & Setup
Eliminate manual, repetitive work in material movement
Improve safety and throughput with simple automation
05: Apply Low Cost Automation (LCA)
Introduce 3-layered structure with multiskilled teams
Match manpower with workload using workload analysis
06: Re-Engineer Workforce & Roles
Apply 5S and space optimization
Clear clutter, reduce search time, and smoothen man-material flow
07: Enable Flow & Eliminate Waste
PBOPlus 7-Step Model
for Intelligent Truck Traffic & Yard Management
1: Real-Time Truck Tracking
• Live, stage-wise visibility of each truck from gate-in to gate-out
• Integrated GPS, RFID, or QR-based tracking
•
