PBOPlus’s Time‑Reduction Accelerator is designed to eliminate hidden delays across operations — in material handling, gate entry, logistics flows, and production processes. It begins with a comprehensive 5M (Manpower, Materials, Machinery, Methods, Money) value-chain assessment, mapping every step that adds time without generating value
✔️ Process Redesign: Gatekeeping, loading/unloading, shift schedules, and batch coordination are reengineered to eliminate redundancies.
✔️ Digital Tracking: Real-time logistics and machine‑status dashboards empower teams to monitor, pre-empt, and coordinate through bottlenecks as they occur.
✔️ Governed Execution: Milestone-based delivery models, governed by daily huddles and weekly reviews, ensure adherence to time goals.
Proven Results:
In steel plants, truck gate cycle reduced from 16 hours to 4 hours, cutting logistics time by 75% and lifting workforce productivity by 30% .
In sponge-iron manufacturing, logistics time was compressed from 24 hours to 8 hours, delivering ₹40 crore savings and boosting manpower efficiency by 25%
These gains are not statistical anomalies—they’re repeatable outcomes driven by disciplined governance, data transparency, and cross‑functional coordination. The result: faster throughput, higher resource utilization, lower costs, and a foundation for scaling high-speed operations.

